On Saturday we went to look at the dock link which is very nearly finished now.
Above is the new bridge linking Princes Dock with Princes Half Tide Dock. Before it was completely blocked off, now there is a new concrete bridge to allow boats through.
This is the new lock in the dock. This is where boats will enter the lock in Princes Dock and then the tunnel under St Nicholas Place.
This is the North Basin, in front of the Liver Buildings. It wont be long before boats are passing though here.
No comments:
Post a Comment